Digital realty, Dublin, Ireland, datacentre construction by  ÌÇÐÄÔ­´´vlog
Project

Digital Realty

A two-storey datacentre delivered in Ireland in a fast-tracked programme of 42 weeks.
  • Customer
    Digital Realty
  • Completion Date
    November 2018
  • Quantity Surveyor
    Line Sights
  • Value
    £18m
  • Project Manager
    ÌÇÐÄÔ­´´vlog
  • Area
    53,819 sq ft
  • Program Duration
    42 weeks
  • Architect
    NWA
  • ME Engineer
    Arup

Introduction

ÌÇÐÄÔ­´´vlog has completed the construction of a two-storey datacentre in Dublin for a large US-based co-location datacentre specialist. The quick build was completed within an impressive timeframe of 42-weeks, further strengthening our relationship with the repeat client as they look to expand across Europe. 

The project

The project involved delivering two 3MW data halls, which form part of the second of four phases of development on the client’s Profile Park Campus in Clondalkin, Dublin. 

The high-specification datacentre includes indirect adiabatic air-cooling systems, and advanced resilient power solutions.

Making it happen 

Despite the challenges faced, the team delivered a fast-tracked high-quality result through constant collaboration and communication with the client, local contractors and the team.

The team is currently in discussions with the client to extend the scope of the original contract to include the tenant's technical fit out.